Posted inNews

ZRA allocated land for Batoka Gorge Hydroelectric power project

BY Nokuthaba Dlamini THE Zambezi River Authority (ZRA) has been allocated land for the development of infrastructure for the 2400MW Batoka Gorge Hydro-Electric Scheme (BGHES). The bilateral project between Zambia and Zimbabwe is located within the Batoka Gorge, 47km downstream of the Victoria Falls. The $4 billion power station is anticipated to mitigate critical power shortages [โ€ฆ]