BY Nokuthaba Dlamini THE Zambezi River Authority (ZRA) has been allocated land for the development of infrastructure for the 2400MW Batoka Gorge Hydro-Electric Scheme (BGHES). The bilateral project between Zambia and Zimbabwe is located within the Batoka Gorge, 47km downstream of the Victoria Falls. The $4 billion power station is anticipated to mitigate critical power shortages [โฆ]